South MEP

Solace was appointed to improve the efficiency of a district heating system that served 85 flats across three residential blocks in the Southeast London area. After reviewing the client’s stage 4 design, our team noticed several elements that would have provided limited improvements at the cost of major disruption to the residents. Therefore, we created […]
Brewers Building

Electrical Services Upgrade This contract included the upgrade of the communal lighting, lateral mains and fire alarms within 4 x occupied residential low-rise blocks, one of which was Grade II Listed. All works were completed within programme and budget, whilst causing the minimum amount of disruption to residents possible.
AC101 – City of Westminster

AC101 – Extraction/Life Safety Systems Upgrades Social Housing Contract Solace MEP working on behalf of city of Westminster council were appointed to complete upgrades to domestic dwellings within the social housing sector. The project consisted of upgrade/installation of state of the art extraction systems to occupied properties. Positive input ventilation (PIV) fans were installed to […]
AD110 – City of Westminster

AD110 – K&B Upgrades/Extraction/Life Safety Systems Social Housing Contract Solace MEP working on behalf of city of Westminster council were appointed to complete upgrades to domestic dwellings within the social housing sector. The project consisted of full EICR inspections to ascertain the current condition of the properties many of which had not been inspected as […]
Devonshire House

Comprehensive Electrical Upgrade Devonshire House underwent an extensive list of enhancements, including in-flat radiator upgrades, a comprehensive LV Upgrade spanning from the main head to lateral mains and final subcircuits within communal spaces, lighting upgrades, installation of a new centralised boosted cold-water system, implementation of a sprinkler system, revamping of the fire alarm system, and […]
Lewisham Homes EICR’s

Electrical Works for Lewisham Homes This contract involved the testing and inspection of around 7000+ occupied residential properties to assess their electrical compliance status. It also included the installation of new fire alarm systems within the properties, as well as any remedial works required to make the property safe and compliant. The main challenges were […]
Spa Green

Hot Water & Heating Services This contract involved replacing communal heating and domestic hot water distribution across 3 tower blocks, totalling 19 risers and 81 occupied dwellings. The main challenge we faced was the small size of the risers, which made it difficult to install the new pipework and support systems, as well as gaining […]