Spa Green

Hot Water & Heating Services​

This contract involved replacing communal heating and domestic hot water distribution across 3 tower blocks, totalling 19 risers and 81 occupied dwellings. The main challenge we faced was the small size of the risers, which made it difficult to install the new pipework and support systems, as well as gaining access to each dwelling. We had to coordinate the access into each dwelling carefully and have two risers running concurrently at any one time to meet the strict deadlines. The confined space of the riser meant that we had to plan all our daily tasks carefully, maintain tidy workspaces, and ensure that we had the necessary plant, tools, and materials on hand to effectively manage the program phases and install the new pipework.

All works were completed within the programme and budget, causing the minimum amount of disruption possible to residents.

The project was a success, and as a result, we have been hired by the same client to carry out further new pipework within the dwellings at the same block.