Victoria Barracks

MTHW Boiler Room Replacement (Full M&E)

The plant installed, capable of delivering 6.4mW at a flow temperature of 130°C, forms part of a major district heating network and includes the following equipment which we have supplied, installed and commissioned: 4no 1.6mW Boilers including new flues, New gas supply including 4no Gas boosters, 2no HWS Calorifiers, Plate heat exchangers transferring fluid from MTHW to local LTHW systems. Pumps, inertia bases and associated controls. New side stream filtration units on the heating systems plus new water conditioners and reverse rinse filters on the domestic water services. New building energy management systems including new metering and gas safety systems. Full water treatment, flushing and commissioning processes. New lighting and emergency lighting systems. Thermal insulation

Our design responsibility included taking the stage 4 information through to RIBA stage 6. This involved the production of fully coordinated Revit models and COBie data to ISO 19650 standards. The precise 3D modelling allowed us to reduce timescales onsite and minimise health and safety risks given the necessary welding/hot works was undertaken offsite under controlled conditions. In addition, full equipment schedules complete with assett IDs have been produced to allow the production of a detailed assett tagging system.